Riser Connection To Hot Tap Valve On Indorama 18″ Gasline

 

NTSL successfully executed a technically demanding riser connection to a hot tap valve on the Indorama 18″ gasline, delivering a high-precision pipeline intervention scope in full compliance with Indorama engineering specifications and international pipeline construction and hot tap safety standards.

NTSL mobilized a specialist pipeline crew with certified hot tap equipment, precision welding capability, and extensive experience in live pipeline intervention works to execute this project safely and without interruption to gas supply operations. Every phase of the riser connection and hot tap valve installation was carried out in strict accordance with Indorama approved procedures, weld inspection requirements, and HSE protocols — ensuring zero incidents, full system pressure integrity, and seamless connection to the existing 18″ gasline infrastructure upon completion and formal handover to the client.

Project Information

Client Name

Indorama Eleme Petrochemicals Limited

Start Time

01 Jan, 2024

End Time

26 Apr, 2024

Social Links

Have a
project in
mind?