Construction of Olom–AO (Olom–41) Flowline in OML 30

Flowline Construction Works for Olom–AO (Olom–41) in OML 30

NTSL successfully executed the complete construction of the Olom–AO (Olom–41) flowline within Oil Mining Lease 30, delivering a technically demanding pipeline construction scope in full compliance with client engineering specifications and international flowline construction and integrity standards.

NTSL mobilized an experienced flowline construction crew equipped with specialized pipe welding, laying, and testing equipment to execute this project safely and efficiently across the challenging OML 30 terrain. Every phase of the flowline construction was carried out in strict accordance with approved construction procedures, weld inspection requirements, environmental protection protocols, and HSE requirements — ensuring zero incidents, full structural and pressure integrity, and safe commissioning of the completed Olom–AO flowline for crude oil transportation service upon formal handover to the client.

Features of Project

Right-of-way survey, clearing and preparation
Pipe stringing, bending and joint fit-up
Full penetration girth weld execution and NDT

Project Information

Client Name

John Henry

Start Time

01 Jan, 2024

End Time

26 Apr, 2024

Social Links

Have a
project in
mind?