5 Tie-In of 16” x 12” Barred Tee To SPDC 16” Gaslineat Rumukwurushi

Precision Pipeline Tie-In Works for SPDC

NTSL successfully executed five critical tie-in connections of 16" x 12" barred tees to the Shell Petroleum Development Company 16" gasline at Rumukwurushi, delivering a technically demanding scope with full compliance to SPDC specifications and international pipeline construction standards.

NTSL deployed an experienced pipeline construction crew equipped with specialized hot-tap and tie-in equipment to execute this project safely and efficiently. Every tie-in point was carefully surveyed, prepared, and executed in strict accordance with SPDC approved procedures, weld inspection protocols, and HSE requirements ensuring zero incidents and full operational integrity across all five connection points upon project completion and handover.

"NTSL demonstrated exceptional technical competence and professionalism throughout the execution of this tie-in project, delivering every connection point safely, on schedule, and in full compliance with our pipeline specifications."

Features of Project

NTSL applied rigorous quality control and technical precision across every phase of this pipeline tie-in scope.

Pipeline survey and tie-in point preparation
Barred tee fabrication and fit-up inspection
Weld execution and non-destructive testing

Project Information

This project further demonstrated NTSL's established capability in executing for major international oil operators in the Niger Delta.

Client Name

(SPDC)

Start Time

01 Jan, 2024

End Time

26 Apr, 2024