Permanent Repair of Vandalized Portion of Oredoand Oziemgbe

Emergency Permanent Repair of Vandalized Pipeline Sections at Oredo and Oziemgbe

NTSL successfully executed the permanent repair of vandalized pipeline sections on the Oredo and Oziemgbe lines, delivering a technically demanding pipeline restoration scope in full compliance with client engineering specifications and international pipeline repair and integrity standards.

NTSL mobilized a specialist pipeline repair crew with certified welding capability, pipe cutting equipment, and extensive experience in emergency pipeline restoration works to execute this project safely and efficiently. Every phase of the permanent repair was carried out in strict accordance with approved repair procedures, weld inspection requirements, and HSE protocols — ensuring zero incidents, full restoration of pipeline structural integrity, and safe return of both lines to normal operational service upon completion and formal handover to the client.

Features of Project

Emergency pipeline survey and damage assessment
Vandalized section excavation and pipe cutting
Replacement spool fabrication and dimensional inspection

Project Information

Client Name

Confidential — Niger Delta Oil Operator

Start Time

01 Jan, 2024

End Time

26 Apr, 2024

Social Links

Have a
project in
mind?